Due to heavy rains in Gujarat, roads and paths have been damaged. Recently, a meeting was held by the Chief Minister to repair the roads. In this meeting, a presentation of the repair work was presented to the Chief Minister. In which detailed details were given by the Road Construction Department. In these details, the work of structures and bridges is mostly in progress on the roads affected by the rain. It was said that such work is being carried out on 243 bridges and their diversion is being continuously monitored. At that time, many questions have arisen as to why no action was taken regarding the Gambhira Bridge in Padra, Vadodara. »
|
It is ok to contact this poster with commercial interests.
|